Skip to content

Add more advanced scheduling example #24

Open

Description

@saulshanabrook

Either here or in the tutorial we should add an example of more advanced scheduling, to show why we need the complexity of binding a scheduler.

@yihozhang gave an example like this where you want analysis to not use the backoff (for performance, even though saturating with back-off is the same saturating without it), but the other parts you do want to use the back-off:

(run-schedule
  (let-scheduler bo (back-off))
  (repeat 10
    (saturate analysis)
    (run-with bo optimization)))

Activity

  1. added a commit that references this issue on Dec 6, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions