You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Workstream E11 of the UK-migration master epic #665; child of #145. Explicitly after the swap-acceptance child signs off — 2023 is the parity vintage because the frozen incumbent reference is enhanced_frs_2023_24.
Scope
Re-pin the stage-manifest artifacts to the FRS 2024-25 release (survey year 2024, calibration year 2025) and the matching non-FRS vintages; re-run the scale ladder.
Adopt the incumbent's release-object discipline (one frozen release object naming survey/base/calibration years, study number, DOI, zip sha) as a declarative resource; label tape years by tax year (e.g. 2024_25) per the SPI-stage convention already adopted from policyengine-uk-v2 lessons.
Retire hmrc_income_source_stages.json and its lockstep test (the frozen June evidence anchor is superseded by the refreshed pins).
Acceptance
The build materializes at the refreshed vintage end to end; every artifact pin updated; the battery passes at the new vintage.
No period alignment left implicit.
Depends on: E10; WS-F for calibration-year materialization.
Workstream E11 of the UK-migration master epic #665; child of #145. Explicitly after the swap-acceptance child signs off — 2023 is the parity vintage because the frozen incumbent reference is
enhanced_frs_2023_24.Scope
2024_25) per the SPI-stage convention already adopted from policyengine-uk-v2 lessons.hmrc_income_source_stages.jsonand its lockstep test (the frozen June evidence anchor is superseded by the refreshed pins).Acceptance
Depends on: E10; WS-F for calibration-year materialization.